For regular users of the facilities here at the Sport & Fitness Centre on Inglemire Lane, a clear vision as to the size and scale of the new Sports Pavilion is now very obvious. The scaffold in situ both internally and externally has allowed for the blockwork and brickwork to progress to a higher level. The internal scaffold also gives an idea as to the design of the building inside with rooms and corridors taking shape.

Pavilion Redevelopment

A CCTV survey has been carried out on the existing drainage for surface water to establish a discharge point. Blockwork and brickwork will continue over the coming weeks.

Pavilion Redevelopment

Across to the new Rugby Pitch and further rolling has been carried out with a second
inspection by Labosport takign place on 6 April. As a result of that inspection, some
remedial actions have been deemed necessary which the project group and
contractors will be discussing shortly. More information about the rugby pitch will
be published after the Easter holiday.

Until then, enjoy the break!

Rugby Pitch